Three notes on installing laminate flooring

What is the installation method for laminate flooring?

The installation of laminate flooring generally adopts the “suspension laying method”, that is, after laying a layer of floor mat on the ground, the floor is spliced ​​together by glue.

What should I pay attention to when installing and using the floor heating floor?

In addition to the necessary measures under normal installation conditions, it should also be noted that:

1. Before the paving, the pipeline should be clearly defined. Do not use the electric hammer to hammer and hammer.

2. Do not make a stove, use an electric stove or burn a bonfire on the ground at the construction site, because the aluminum-plastic composite pipe will melt under high temperature.

3. Before laying the floor heating floor, it is necessary to carry out the heating test, each time raising 5 °C, and maintaining the maximum temperature for 72 hours.

4. The temperature of the ground heating system should be controlled at 18 °C within 3 days before paving. After 3 days of paving, it can be increased by 5 °C every day until the desired temperature is reached. However, the surface temperature should not exceed 28 °C.

5, the floor should try not to make fixed decorative parts or place legless furniture, so as not to affect the hot air flow and reduce the thermal effect.

What are the installation conditions for laminate flooring?

1. There is no cross-construction at the installation site, and there are no special construction restrictions.

2, the ground is clean, dry, smooth and firm. Clean, that is, no floating soil, no obvious construction waste, etc.; dry, the ground humidity should be less than 2%, no moisture or leakage; flat, the height difference should be less than 5mm within 2m; firm, the foundation is strong, no loose .

3. The corners are flat. The installation space should be left under the door and door cover (15mm under the door and 12mm under the door cover). Corners, heating hoods and other irregular details should also be handled.

4, temperature and humidity adaptation. Before installation, the floor should be stored indoors to adapt to changes in temperature and humidity; especially in the cold season in the north, it should be installed at the installation site for 24 hours.

5. For the ground heating system, the temperature should be controlled at 18 °C 3 days before paving, and then increase by 5 °C every day after 3 days of paving, but the surface temperature should not exceed 28 °C.

Cosmetic Jar

Cosmetic Jars,Glass Cosmetic Jars,Face Cream Jars,Cream Cosmetic Jars

Shijiazhuang HuangJia Trading Co., Ltd , https://www.hj-cosmetic.com

Posted on