How does air conditioning move? Air conditioning transfer steps

 

Some consumers think that air-conditioner transfer is a simple operation. In order to save money to find individual maintenance points near the community or "guerrillas", it is often worth the loss, because improperly moving the machine is likely to cause various problems such as air-conditioning leakage and affecting the cooling effect. . So how does air conditioning move ? The following decoration home decoration network Xiaobian will bring you the air conditioning transfer steps, let's take a look.

How does air conditioning move?

 

 

空调移机

 

 

Air conditioning transfer steps 1, preliminary preparation

 

The transfer personnel will disassemble the door and bring a complete set of tools and safety equipment. The air conditioner transfer machine must be equipped with a safety belt to prevent accidents.

 

Air conditioning transfer step 2, recycling refrigerant

 

First, the machine is turned on and off. After the external machine is running, the fluorine valve is closed to close the small valve. After the valve frosting is turned off, the large valve is closed and the battery is shut down immediately. Pull off the power supply and tighten the safety cap to allow the air conditioner to move the refrigerant in the machine to the outdoor unit.

 

Air conditioning transfer step 3, remove the indoor unit

 

When removing the indoor unit, prevent condensation water from flowing into the circuit board.

 

 

空调如何移机 

 

 

Air conditioning transfer step 4, remove the outdoor unit

 

When disassembling the outdoor unit, pay attention to balance to avoid vibration and shaking while unloading, and finally wrap it in plastic for handling.

 

Air conditioning transfer step 5, reinstall

 

Pay attention to the installation position and convection when reinstalling the air conditioner. Finally, use a detergent to check for leaks, observe the presence or absence of air bubbles from each joint, and verify that the system does not leak, then tighten the valve safety cap.

 

Air conditioning transfer step 6, running inspection

 

Finally, the air in the pipeline and the internal machine is removed and the pilot operation is completed.

 

The above is how the air conditioner brought to you by Xiaobian is transferred? The whole content of the air-conditioner transfer procedure , I believe that everyone has a basic understanding of how to move the air conditioner after reading this article. If you want to know more about the decoration consultation, please click to enter the decoration knowledge channel !

 

Mobile phone sweeping decoration without troubles - decoration classroom (micro signal: zxzhijia) . Pay attention to WeChat public number every day to get more decoration knowledge, decoration cases, more decoration companies, etc. You can pick, decoration home - the most popular home decoration tender platform.


Open WeChat, scan the QR code, and pay attention to “zxzhijia” for more decoration information.

 

空调如何移机?空调移机步骤 

Y Bar

BaoJi JiaXin Nonferrous Metal Co., Ltd. , https://www.jiaxin-ti.com

Posted on